← Back to GuidesHandover

Defects Inspection Checklist

Don't Pay The Final 5-10% Yet

Once you make the final payment, your leverage is gone. Perform a thorough defects check 1-2 weeks before the promised handover date.

The Checklist

  • Carpentry: Doors align, drawers slide smooth, no sharp edges
  • Tiling: Tap tiles with coin (hollow sound = air pocket = potential crack)
  • Plumbing: Turn on all taps, check under sinks for drips
  • Electrical: Test every socket with a phone charger
  • Paint: Check for patchiness under bright light
  • Glass: Check for scratches on mirrors and shower screens

Rectification Timeline

💡Be Reasonable
Minor touch-ups (paint, silicone) take days. Major rectifications (replacing a scratched glass panel or hollow tiles) can take weeks. Agree on a timeline for fixes before moving your furniture in.

Ready to start planning your renovation?

Start with a few questions →